HELP TOPICS
DOWNLOAD

Results

Menu contains the following items:

Results Manager

A results manager allows to operate with saved to files results. Execute Home - Result - Results Manager from the ribbon:

Results | Help | SDC Verifier

The results are sorted by folders and divided into two parts:

Output Sets - calculated results by solver.

    Results:

  • Jobs - simple displacement, stress etc. results..

  • Standards - calculated results for fatigue, buckling etc.

  • Tools - calculated results for weld summation, rainflow counting and other tools.

Results | Help | SDC Verifier - open window for selecting results folder path;

Results | Help | SDC Verifier - create default result folder that is based on the project file location if it is saved, or on the model file location otherwise;

Results | Help | SDC Verifier - depending on selected item, removes selected Output Sets or detaches selected Results;

Note: If a selected node contains sub-nodes, the results are detached for all the child items.

Results | Help | SDC Verifier - expand all nodes;

Results | Help | SDC Verifier - collapse all nodes;

Results | Help | SDC Verifier - re-read info from the header files and attach files to existing jobs/standards/tools results;

Lock / Unlock results

When a project is loaded, the results are automatically attached and the results folder is locked by current computer to prevent the results overwriting. The messages are displayed:

Results | Help | SDC Verifier

It is possible to lock / unlock the result folder manually in the results manager window.

When the project is closed, the results are automatically unlocked, so other computers can access results overwriting. The results folder will be locked by respective computer in this case.

Store / Restore results

SDC results are stored automatically to the files each time a calculation is performed. By default, the load and check results for the load groups are stored to the files. This can be changed in Project Preferences:

Results | Help | SDC Verifier

The results are restored from the files instead of the calculations. Once they are calculated, they can be used any time when needed. This will reduce the time, necessary to preview the results or generate the report.

Note: The load groups or load sets that contain several loads require memory allocation also for their items. All results are kept in RAM memory. If used RAM memory reaches 90% of total RAM memory before the next calculation (e.g. stresses for another load), all results are released and will be read from files again once they are needed for calculations.

Remove Results

After performing analysis few times or importing model/results, some results from the solver can be odd. Command allows to remove unnecessary Output Sets from the model and reduce the model size on saving (Rebuild Model command form the File page of the ribbon is required).

To remove results execute Home - Result - Remove Results from the ribbon.