HELP TOPICS
DOWNLOAD

Results

Menu contains the following item:

Results Manager

A results manager allows to operate with saved to files results. Execute Home - Result - Results Manager from the ribbon:

Results | Help | SDC for Simcenter 3D

The results are sorted by folders (by loads individually for each job and by checks individually for each standard) and divided into two parts:

Job Results - simple displacement, stress etc. results.

Check Results - calculated results for fatigue, buckling etc.

Results | Help | SDC for Simcenter 3D - open window for selecting results folder path;

Results | Help | SDC for Simcenter 3D - create default result folder that is based on the project file location if it is saved, or on the model file location otherwise;

Results | Help | SDC for Simcenter 3D - detach selected load results and remove respective files from disc;

Note: If a job, load, standard or check is selected, the results are detached for all the child items.

Results | Help | SDC for Simcenter 3D - expand all nodes;

Results | Help | SDC for Simcenter 3D - collapse all nodes;

Results | Help | SDC for Simcenter 3D - -re-read info from the header files and attach files to existing loads/check results;

Lock / Unlock results

When a project is loaded, the results are automatically attached and the results folder is locked by current computer to prevent the results overwriting. The messages are displayed:

Results | Help | SDC for Simcenter 3D

It is possible to lock / unlock the result folder manually in the results manager window.

When the project is closed, the results are automatically unlocked, so other computers can access results overwriting. The results folder will be locked by respective computer in this case.

Store / Restore results

SDC results are stored automatically to the files each time a calculation is performed. By default, the load and check results for the load groups are stored to the files. This can be changed in Project Preferences:

Results | Help | SDC for Simcenter 3D

The results are restored from the files instead of the calculations. Once they are calculated, they can be used any time when needed. This will reduce the time, necessary to preview the results or generate the report.

Note: The load groups or load sets that contain several loads require memory allocation also for their items. To reduce memory usage, perform all necessary calculations once, save the project file and restart the program. The results will be read from the files and memory will be allocated for respective load sets and load groups only.